{"id":33864,"date":"2026-04-07T17:02:04","date_gmt":"2026-04-07T15:02:04","guid":{"rendered":"https:\/\/www.soletanche.pl\/?post_type=avada_portfolio&p=33864"},"modified":"2026-05-25T13:09:21","modified_gmt":"2026-05-25T11:09:21","slug":"norblin-factory-warsaw","status":"publish","type":"avada_portfolio","link":"https:\/\/www.soletanche.pl\/en\/offer-portfolio\/norblin-factory-warsaw\/","title":{"rendered":"Norblin Factory, Warsaw"},"content":{"rendered":"

Project description<\/p><\/h2><\/div>

The office building complex is located in the Wola district at \u017belazna Street 51\/53. Construction began in December 2017 and was completed in August 2021. The usable floor area of this seven-storey development totals 64,000 m\u00b2, with the largest portion consisting of office space \u2013 40,000 m\u00b2, and retail and service units \u2013 24,000 m\u00b2. In addition to office, service and commercial areas, the building also includes a cultural zone featuring a contemporary theatre, an art-house cinema, and the Museum of the Former Norblin Factory, which is an integral part of the complex and one of its main attractions.<\/p>\n<\/div>

<\/div>
<\/div>
<\/div>

Scope of works \u2013 Soletanche Polska<\/p><\/h3><\/div>

The project involved integrating the historic fa\u00e7ades of the former factory into the structure of the new development. Soletanche Polska was responsible for ensuring the stability of the historic walls by underpinning their foundations. Another construction challenge was the execution of foundations for the demanding above-ground structure, as well as diaphragm walls serving a triple function: as the walls of a four-level underground car park, excavation support, and a foundation element supporting the superstructure. The car park provides 720 parking spaces for cars and 200 bicycle spaces.<\/p>\n<\/div>

<\/span><\/div>
<\/div><\/div><\/div>

Project location:<\/p>\n

Warsaw, Poland<\/span><\/b><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

Investor:<\/span><\/p>\n

Capital Park<\/span><\/b><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

General Contractor:<\/span><\/p>\n

Warbud<\/span><\/b><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

Total building area:<\/p>\n

64 000 m\u00b2<\/span><\/b><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

Number of above-ground floors:<\/p>\n

8<\/span><\/b><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

Number of underground floors:<\/p>\n

6<\/span><\/b><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

Number of parking spaces:<\/p>\n

755 m<\/span><\/b><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>
<\/div><\/div><\/div>

The first stage of works involved securing the historic fa\u00e7ades using jet grouting columns. The limited clearance and narrow spaces between buildings proved challenging, meaning that column installation required time and high precision. Soletanche completed 1,423 columns (977 for foundation underpinning and excavation support, and 446 for ground improvement). The next task was the construction of diaphragm walls for the four-level underground car park. A total of 18,672 m\u00b2 of diaphragm walls with a thickness of 80 cm was constructed, forming both the excavation support and the walls of the underground parking facility. The deepest diaphragm wall panels reached 48 m below ground level. Barrettes were also constructed using the same technology \u2013 197 units, each 27 m deep \u2013 working together with the foundation slab. The contract also included temporary columns supporting the parking floor slabs.<\/p>\n

The execution of diaphragm walls was one of the most challenging elements of the geotechnical scope. This was not only due to the proximity of historic walls, but also because three buildings were to be founded on the level 0 slab and located within the footprint of the future underground car park. This meant the underground structure had to be built directly beneath them. As a result, one building (B-15, weighing 900 tonnes) had to be relocated, and two buildings (B-17 and B-18, with a combined weight of 750 tonnes) had to be suspended to allow construction of the level 0 slab underneath. For this purpose, 84 micropiles, reinforced with HEB steel sections, were used. A steel pile cap was installed on the micropiles to support the buildings and transfer loads onto the micropiles. The building was then excavated to the required elevation and a reinforced foundation slab was constructed, on which the building was ultimately placed.<\/p>\n<\/div>

<\/div><\/div><\/div>
<\/span><\/div>
<\/span><\/div>
<\/div><\/div><\/div><\/div><\/div>
0<\/span> m <\/span><\/div>
diaphragm wall depth<\/div><\/div><\/div>
0<\/span> m<\/span><\/div>
diaphragm wall thickness<\/div><\/div><\/div>
0<\/span> pcs.<\/span><\/div>
number of barrettes<\/div><\/div><\/div>
0<\/span> pcs.<\/span><\/div>
number of jet grouting columns<\/div><\/div><\/div>
0<\/span> pcs.<\/span><\/div>
number of micropiles<\/div><\/div><\/div>
0<\/span> m\u00b2<\/span><\/div>
diaphragm wall area<\/div><\/div><\/div><\/div>
<\/div>
<\/div><\/div><\/div><\/div><\/div>
<\/div><\/div>

Discover Soletanche Polska\u2019s offer<\/h3><\/div>

Explore the comprehensive offer of Soletanche Polska: markets, services, and foundation technologies for construction, infrastructure, industry, and environmental protection. It includes the full range of competencies required to deliver demanding geotechnical and foundation projects. Our approach enables flexible adjustment of the scope of works to the scale, nature, and specific conditions of each investment.<\/p>\n<\/div>

<\/i>Learn more<\/span><\/a><\/div><\/div><\/div><\/div><\/div>

Related technologies<\/p><\/h2><\/div>

<\/div><\/div><\/div>

Diaphragm Wall<\/strong><\/h3><\/div>
\n

Diaphragm walls are reinforced concrete structures built in the ground, used as vertical supports for deep excavations.<\/p>\n<\/div>\n<\/div>

<\/i>Learn more<\/span><\/a><\/div>
<\/span><\/div>
<\/div><\/div><\/div>

Micropiles<\/strong><\/h3><\/div>

Micropiles are piles up to 300 mm in diameter, used to transfer structural loads through skin friction in the ground.<\/p>\n<\/div>

<\/i>Learn more<\/span><\/a><\/div>
<\/span><\/div>
<\/div><\/div><\/div>

Jet grounting<\/strong><\/h3><\/div>

Jet grouting is a technology requiring limited space, used for deep soil mixing with a cement binder.<\/p>\n<\/div>